FEATURED PROJECTS
BINGO RECYCLING CENTRE EASTERN CREEK
Dewcape were engaged by Bingo Industries to Design and construct the world’s largest mixed waste recycling facility.
“The site currently recovers around 85% of materials that are processed at its recycling facility. When development of the Recycling Ecology Park is complete, it will be capable of processing and recycling all Building & Demolition (B&D) and Commercial & Industrial (C&I) waste streams, including bricks, concrete, glass, plastic, metal, sand, soils, tyres and timber”
Dewcape works include for design and construct of a 9000m² structural steel warehouse, including services for a processing plant & 15,000m² of external concrete pavement. The plant has been fitted with the latest in safety, environment and fire management technology and rain water catchment tanks.
HOME CONSORTIUM – CHULLORA
Dewcape were engaged by Home Consortium to convert a disused warehouse into a large format shopping centre. The project involved detailed structural modifications of the existing building to suit the new purpose.
Additionally, the base build services or electrical, hydraulic fire and HVAC were all reconfigured in detail to meet the new tenancy and certification requirements.
DAVID JONES – BOURKE STREET MALL
Dewcape were engaged by David Jones to refurbish 18,000m2 of floor area over 6 levels of high end retail space and new amenities. The project involved working in a live environment, heritage refurbishment and 11 individual stages of construction, totalling over 50,000 hours of work. With materials sourced from 15 countries across the globe.
Additionally, the base build services or electrical, hydraulic fire and HVAC were all reconfigured in detail to meet the new tenancy and certification requirements.
BINGO RECYCLING CENTRE EASTERN CREEK
Dewcape were engaged by Bingo Industries to Design and construct a purpose-built Resource Recovery, Tipping & Process Warehouse for Commercial & Industrial Building Waste.
BINGO RECYCLING CENTRE WEST MELBOURNE
When opened in April 2019, Bingo’s recycling facility at West Melbourne was considered the pinnacle or waste management within Victoria. Dewcape completed this ambitions project within 12 months, whilst Bingo maintained operational movements on the site.
BINGO RECYCLING FACILITY AUBURN
Reconstruction and Transformation of a 6000 square metre storm damaged warehouse into a State of the Art Recycling Facility.
BINGO RECYCLING FACILITY ST MARYS
Bingo Recycling Centre St Marys, the most advanced waste processing facility in NSW and Dewcape led the planning, design, and construction of the unique facility.
BINGO KEMBLA GRANGE – DAM RECTIFICATION
BINGO KEMBLA GRANGE – DAM RECTIFICATION
Dewcape was engaged by Bingo Industries to rectify 3 water storage dams at their Kembla Grange recycling facility.
BINGO RECYCLING CENTRE MINTO
Dewcape were engaged by Bingo Industries to Design and construct a purpose-built Waste transfer Warehouse to facility Commercial & Industrial Building Waste.
INTERFACE MINTO REBUILD
STAGE 1 – Conversion of an existing warehouse into purpose built manufacturing facility for Interface Australia including structural, civil, installation of tanks and associated works.
INTERFACE MINTO OFFICES
STAGE 2 – Extension of the existing Administration Building as well as construction of the new Production Office complete with NATA certified laboratory.